BALCOM CANYON ROAD – ROADWAY STABILIZATION AT MP 5.66
TRANSPORTATION PROJECT DESCRIPTION Balcom Canyon Road – Roadway Stabilization at MP 5.66 ESTIMATED CONSTRUCTION COST $50,0000 CONST. START DATE November 2025 CONST. END DATE March 2026 PROJECT MANAGER/ DESIGN ENGINEER Matthew Hespenheide CONTACT NUMBER (805) 654-2187 Location Map – Balcom Canyon Road Roadway Stabilization at MP 5.66