SOMIS FARMWORKER HOUSING

TRANSPORTATION  PROJECT DESCRIPTION Somis Farmworker Housing ESTIMATED CONSTRUCTION COST $1,800,000 CONST.  START DATE April 2026 CONST.  END DATE December 2026 PROJECT MANAGER/ DESIGN ENGINEER Gianfranco Laurie CONTACT NUMBER (805) 654-2063   Location Map – Somis Farmworker Housing  

Public Works

FOOTHILL ROAD AT MP 3.33 & SANTA SUSANA PASS ROAD AT MP 1.0 CULVERT REPLACEMENT

TRANSPORTATION  PROJECT DESCRIPTION Foothill Rd  & Santa Susana Pass Rd Culvert Replacement ESTIMATED CONSTRUCTION COST $250,000 CONST.  START DATE September 2026 CONST.  END DATE October 2026 PROJECT MANAGER/ DESIGN ENGINEER Daniel Espinoza CONTACT NUMBER (805) 654-2048   Location Map – Foothill Rd  & Santa Susana Pass Culvert Replacement    Santa Susan Pass Road at MP…

Public Works

BRIDGE ROAD BRIDGE #442 SLOPE REPAIR

TRANSPORTATION  PROJECT DESCRIPTION Bridge Road Bridge #442 Slope Protection ESTIMATED CONSTRUCTION COST $1,495,000 CONST.  START DATE June 2027 CONST.  END DATE July 2027 PROJECT MANAGER/ DESIGN ENGINEER Howard De Leon CONTACT NUMBER (805) 654-3987   Location Map – Bridge Road Bridge #442 Slope Repair