Project Description:
-
-
- Approximately 0.80 miles of new curb, gutter and sidewalks on various roads
- Approximately 800 feet of a new Class I bike path
- New curb ramps, bulb-outs, and driveways approaches
- Installing Rectangular Rapid Flashing Beacons for controlled crosswalks
- Signing and striping upgrades
-
Current Status:
-
-
-
- Environmental (CEQA)
-
-
Next Steps:
-
-
- Design 2026
- Construction “Out-Years”
-