Saticoy Pedestrian Improvements

Project Description:

      • Approximately 0.80 miles of new curb, gutter and sidewalks on various roads
      • Approximately 800 feet of a new Class I bike path
      • New curb ramps, bulb-outs, and driveways approaches
      • Installing Rectangular Rapid Flashing Beacons for controlled crosswalks
      • Signing and striping upgrades

Current Status:

        • Environmental (CEQA)

Next Steps:

      • Design 2026
      • Construction “Out-Years”

Project Manager: Daniel Espinoza (805) 654-2048