Project Description:
-
-
- Approximately 1.15 miles of new curb, gutter and sidewalks on various roads
- New curb ramps, bulb-outs, and driveways approaches
- Installing Rectangular Rapid Flashing Beacons for controlled crosswalks
- Signing and striping upgrades
-
Current Status:
-
-
- Environmental (CEQA)
-
Next Steps:
-
-
- Design 2026
- Construction “Out-Years”
-
Project Manager: Said Negm (805) 654-3770