TRANSPORTATION PROJECT DESCRIPTION | Sumac Drive Storm Drain Replacement |
ESTIMATED CONSTRUCTION COST | TBD |
CONST. START DATE | TBD |
CONST. END DATE | TBD |
PROJECT MANAGER/ DESIGN ENGINEER | Chase Luckey |
CONTACT NUMBER | (805) 654-2050 |
TRANSPORTATION PROJECT DESCRIPTION | Sumac Drive Storm Drain Replacement |
ESTIMATED CONSTRUCTION COST | TBD |
CONST. START DATE | TBD |
CONST. END DATE | TBD |
PROJECT MANAGER/ DESIGN ENGINEER | Chase Luckey |
CONTACT NUMBER | (805) 654-2050 |