Click on link to watch the short video on the Santa Ana Bridge Project Related postsNOTICE OF AVAILABILITY AND INTENT TO ADOPT A MITGATED NEGATIVE DECLARATION – BRIDGE RD TEMPORARY BRIDGE PROJECTMay 20, 2026Roadway Improvements Planned for State Route 34 for Enhanced Traffic SafetyApril 13, 2026Matilija Canyon OutreachNovember 17, 20252025 Walk in the Ventura River WatershedNovember 17, 2025Watershed Protection District to Prepare Ventura River Watershed PlanNovember 17, 2025Adopt a Cabinet Program (Draft)October 15, 2025
NOTICE OF AVAILABILITY AND INTENT TO ADOPT A MITGATED NEGATIVE DECLARATION – BRIDGE RD TEMPORARY BRIDGE PROJECTMay 20, 2026